Excalibur Drills High-Grade Silver-Gold Intercept at Nevada Project

Drill hole BH26001 at Bellehelen returned 360 g/t silver and 2.03 g/t gold over 1.52 metres within a broader mineralized zone. Excalibur Metals reported high-grade silver and gold intercepts from its spring drilling program at the Bellehelen project in Nevada. Hole BH26001

Drill hole BH26001 at Bellehelen returned 360 g/t silver and 2.03 g/t gold over 1.52 metres within a broader mineralized zone.

Excalibur Metals reported high-grade silver and gold intercepts from its spring drilling program at the Bellehelen project in Nevada. Hole BH26001 intersected 360 grams per tonne (g/t) silver and 2.03 g/t gold over 1.52 metres, within a wider 100.58-metre zone grading 16.7 g/t silver and 0.10 g/t gold. The hole ended in mineralization, suggesting potential for deeper extensions.

The 3,122-metre program targeted the Spyglass Ridge area, with assays pending for four of 10 completed holes. The intercept lies in a previously untested zone, interpreted as part of a larger structural system. Excalibur plans follow-up drilling to assess continuity and higher-grade extensions.

Results also included shallower intervals with anomalous gold and silver values, supporting the presence of a near-surface mineralized structure. The project is operated under an option to earn 100% interest in the property.

Leave a Reply

Your email address will not be published. Required fields are marked *